|
|
B E
R O A R C H I T E C T U R E
P L L C
A R
C H I T E C T U R E S U S T A
I N A B I L I T Y P R E S E R V A T I O N
Thirty
Two Winthrop Street, Rochester, New York 14607
585-262-2035 (phone) • 585-262-2054 (fax) •
contact@beroarchitecture.com
(email)
SELECTED
OFFICE/COMMERCIAL PROJECTS RÉSUMÉ
* PROJECTS CONSTRUCTION
COST
| * |
TWO
SOUTH STREET/CLIFTON SPRINGS
G.W. LISK
CORPORATION:
Two story 6,000 SF Masonry office with
major sitework including vehicular bridge
replacement.
|
$350,000 |
|
|
|
| * |
Two
story 6,000 SF addition to corporate offices addition
with (86290/301) sitework. |
$650,000 |
|
|
|
| * |
Two one
story masonry buildings, 9,600 SF
light assembly addition & 4,800 SF plating
addition with minor sitework. |
|
|
|
|
| * |
Single
story 24,000 SF light manufacturing plant
Accessory offices and loading docks’ with sitework. |
$1,200,000 |
|
|
|
| * |
815 W.
Whitney Road(97730/7)
CANTISANO FOODS
Master planning, Receiving Dock Addition, Cooler/Freezer
Addition, Office Addition/ Renovation. |
$4,000,000 |
|
|
|
| * |
U of R
Medical Center (95350)
MEDICAL CENTER
ATHLETIC CLUB
Alterations to existing Athletic Club including accessibility,
life safety, and interior finish upgrades. |
$430,000 |
|
|
|
| * |
691 St.
Paul Blvd./Rochester (95010)
DANTE GULLACE
Conversion of 175,000SF of existing manufacturing to offices
with major sitework. |
$800,000 |
|
|
|
| * |
U of R
Medical Center (93290)
COPY CENTER AND
COMPUTER SALES RELOCATION |
$392,000 |
|
|
|
| * |
115 South
Avenue/Rochester (96110)
RUNDEL MEMORIAL
LIBRARY
Original building interior design consultation
and exterior plaza design. |
|
|
|
|
| * |
7 W. Main
St/Clifton Springs.(94400/1)
WARFIELD BLOCK
Alterations to 1st Floor Restaurant, 2nd and 3rd
Floor office and Banquet Facilities w/ kitchen
and elevator addition. |
$625,000 |
|
|
|
| * |
Main
St./Clifton Springs (94410/1)
PIERCE BLOCK
Rear Facade Addition and interior alterations
To turn of the century retail block. |
$410,00 |
|
|
|
| * |
39 W. Main
Street (95181)
MONROE COUNTY
OFFICE BUILDING
ADA Improvements |
$332,000 |
|
|
|
| * |
588
Trabold Rd. (95700)
RTS LIFT LINE
OFFICES
Alterations to offices. |
$32,000 |
|
|
|
| * |
Lyons
Medical Facility(95550)
CLIFTON SPRINGS
HOSPITAL AND CLINIC
Design of 10,000 SF Medical office building. |
$1,000,000 |
|
|
|
| * |
Union
Depot/Saranac Lake(94031)
VILLAGE OF SARANAC
LAKE
Restoration and alterations to 3,800 SF
Turn of the century train station. |
$550,000 |
|
|
|
| * |
777
DRIVING PARK/ROCHESTER(82651)
AMERICAN PACKAGING
COMPANY:
Feasibility study for one story, 47,000 SF
warehouse addition with accessory offices with
sitework. |
$1,700,000 |
|
|
|
| * |
570-590
SOUTH AVENUE/ROCHESTER(82611)
AVERILL COURT
MEDICAL OFFICES:
One story, 20,000 SF: 8,500 SF fully developed for
medical offices, remainder speculative office space |
$1,400,000
|
|
|
|
| * |
600 OAK
STREET/ROCHESTER(81760)
KLEEN BRITE
WAREHOUSE AND LOADING DOCK:
One story, pre-engineered metal building addition,
139,000 SF, for warehouse and loading dock
with sitework |
$1,520,000 |
|
|
|
| * |
225
BITTNER/ROCHESTER(83440)
KOVALSKY-CARR:
Two story, 12,000 SF warehouse, office, showroom
addition with sitework. |
$389,000 |
|
|
|
| * |
WEST MAIN
STREET/LIMA(87120)
LIMA FIREHOUSE:
Rehab and renovation of a two story, 3,000 SF building
sitework. |
$350,000 |
|
|
|
| * |
291
WEIDNER ROAD/ROCHESTER(86351)
LITHOCHROME
CORPORATION:
One story, 7,600 SF executive office and plant
addition with sitework. |
$450,000
|
|
|
|
| * |
MAIN-SCIO-HAAG
STREET/ROCHESTER(87163-4)
OFFICE DEVELOPMENT:
Major rehab of two buildings: Three story historic
house, 2,400 SF to be used as offices with apartment
above and a two story, 5,000 SF office with sitework |
$215,000 |
|
|
|
| * |
76 MAIN
STREET/PHELPS(82530)
ONTARIO TELEPHONE:
One story, 1,600 SF office addition with full basement
and 600 SF switching room addition with sitework |
$290,000 |
|
|
|
| * |
105
LINCOLN PARKWAY/EAST ROCHESTER(84530)
CROMWELL
CONSTRUCTION,(under new ownership):
One story, 5,000 SF, pre-engineered metal building
for warehouse and office with sitework |
$250,000 |
|
|
|
| * |
123
DESPATCH DRIVE/EAST ROCHESTER(86500)
PATIO ENCLOSURES:
One story, 7,500 SF, pre-engineered metal building for
manufacturing, office and display with sitework |
$270,000 |
|
|
|
| * |
195
LAGRANGE AVENUE/ROCHESTER(83601)
P.C. PROCESSES EAST:
Two story, 16,000 SF manufacturing, warehouse and
office addition with sitework. |
$650,000 |
|
|
|
| * |
737
ATLANTIC AVENUE/ROCHESTER(85550-9)
PCI RECORDING
SERVICES:
Rehab of two, one story, pre-engineered metal buildings,
20,000 SF total, for video and audio studio production
with accessory offices and sitework. |
$620,000 |
|
|
|
| * |
565
BLOSSOM ROAD/ROCHESTER(86331)
RAECO PRODUCTS:
Rehab of one story, masonry building, 65,000 SF, for
warehouse, light manufacturing and accessory offices
with sitework. |
$1,200,000 |
|
|
|
| * |
458-466
WEST MAIN STREET/ROCHESTER(88100)
REHABILITATION OF
THREE BUILDINGS:
Rehab of three historic buildings, two four story and
one three story with first floor commercial and upper
floor apartments. Total 14,000 SF with minor sitework-
Rehab tax credits applied for. |
$800,000 |
|
|
|
| * |
ONE MOUNT
HOPE/ROCHESTER(84461)
STONE WAREHOUSE
OFFICE BUILDING:
Rehab of three story, historic masonry building for
offices with sitework-Rehab tax credits applied for. |
$1,100,000 |
|
|
|
| * |
MAIN AND
UNION/TRUMANSBURG(85340)
TRUMANSBURG HOME
TELEPHONE:
Rehab two story, 4,800 SF masonry building for
switching equipment and offices with sitework. |
$276,000 |
|
|
|
| * |
119
DESPATCH DRIVE/EAST ROCHESTER(85500)
VERTEX/UPSTATE
DELIVERY:
One story, 10,500 SF, pre-engineered metal building for
warehouse and accessory office with sitework. |
$350,000 |
| * |
101
ONTARIO STREET/EAST ROCHESTER(82070)
WASTE MANAGEMENT OF
NEW YORK:
One story, 1,200 SF office addition, 2,600 SF office
and plant rehab with sitework. |
$131,000 |
|
|
|
| * |
ROUTE
96/PHELPS(83070)
WRIGHT COMPONENTS:
One story 5,200 SF office and manufacturing
addition with sitework. |
$350,000 |
|
|
|
| * |
FORGE
AVENUE/GENEVA(84650)
ZOTOS BUILDINGS 9
AND 10:
One story, 64,500 SF manufacturing and warehouse
addition with minor sitework. |
$1,700,000 |
|
|
|
| * |
110 MT.
HOPE AVENUE/ROCHESTER(90090)
FACADE AND SITE
REHABILITATION:
Improve facade and site for strip center shopping plaza. |
$28,000 |
|
|
|
| * |
VICTOR-EGYPT
ROAD/VICTOR(89311)
ROWLEY-KEEFE
HOUSE/COBBLESTONE CREEK:
Rehab and addition to 1800's cobblestone house for
3,000SF community center with associated pool,
locker rooms, and tennis courts. |
$800,000 |
|
|
|
| * |
CORNELL
UNIVERSITY/ITHACA(90490)
EAST HILL PLAZA:
Facade renovations to strip center shopping plaza. |
$380,000 |
|
|
|
| * |
127-133
SOUTH FITZHUGH STREET/ROCHESTER(89060-3)
HOYT-POTTER HOUSE:
Rehabilitation of 1840's, two story, greek Revival
house to 7,000SF headquarters for Landmark Society
of Western New York with sitework. |
$840,000 |
|
|
|
| * |
2 MAIN
STREET/SARANAC LAKE(90300)
PAUL SMITH'S POWER
AND LIGHT COMPLEX:
Rehabilitation and addition of 1800's, two story
building for 9,200SF Village offices and Police
Department with sitework including surface parking
for 80 cars and a pedestrian bridge. |
$2,000,000 |
|
|
|
| * |
UNIVERSITY
OF ROCHESTER(89210)
S-WING/MEDICAL
CENTER:
Major facade study for repairs and stabilization. |
$1,000,000 |
|
|
|
| * |
CLIFTON
SPRINGS HOSPITAL AND CLINIC(91020)
MEDICAL OFFICE
BUILDING:
Feasibility study for one story, 10,000SF addition
and accommodation for second floor with sitework
including surface parking for 100 cars, drop-off,
and stream rerouting. |
$1,500,000 |
|
|
|
|